Commercial Electricity for Construction Sites in Texas

Construction site electricity runs on short-term meters, variable load, and project-specific contracts that most retail suppliers do not structure well. The right contract matches your project timeline without locking you into terms that outlast the build.

[01] The guide

Energy strategy for Texas construction sites

Construction site electricity is one of the odder segments of the Texas commercial market. The load is short-term (months to a few years), highly variable by project phase, and the meter configuration is temporary. Most retail electricity suppliers quote construction accounts with the same contract templates they use for permanent commercial service, which produces awkward mismatches: 24- or 36-month contract terms on a 14-month build, bandwidth assumptions that do not reflect project phase ramps, and ETFs that can hit the contractor when the project wraps.

This guide covers how construction site electricity works, what the temporary meter configuration means for your contract, how to structure project-duration contracts that match actual build timelines, how multi-project builders and GCs use portfolio leverage, and how Electric Decisions runs a documented procurement built around construction operations. Built for general contractors, residential builders, commercial builders, subcontractors with their own temporary meters, and construction management firms across Texas.

How construction sites use electricity

Construction site electricity load varies dramatically by project phase, project type, and TDU zone.

Phase 1: Site prep and foundation

Temporary meter installed, minimal load. Site lighting, construction trailer, small-tool charging, water pumps.

Phase 2: Rough-in and framing

Load climbs as more trades show up with power tools and equipment. Temporary lighting across the site, trailer and office load, tool and battery charging.

Phase 3: MEP and finishes

Peak project electricity load. HVAC testing, large electrical equipment startup, interior lighting commissioning, elevator testing (for mid-rise projects), temporary conditioning for drywall and paint. For high-rise or industrial projects, this phase can draw more power than many permanent commercial accounts.

Phase 4: Punch and closeout

Load drops as trades leave the site. Final commissioning draws down load. Temporary meter closed, permanent meter energized.

Project type variation. Residential subdivisions carry modest per-lot temporary electricity but can run large aggregate loads when a builder has multiple lots in construction simultaneously. Commercial build-outs run higher per-site. Industrial and infrastructure projects run the highest, especially during commissioning phases.

What makes construction accounts different

Construction accounts differ from standard commercial accounts in three important ways.

Temporary meter configuration: The TDU installs a temporary service meter (often pole-mounted) sized for construction loads. This is a different tariff class than permanent commercial service and carries different delivery charges. When construction completes and the permanent meter is energized, the account transitions, which often triggers new contract paperwork even with the same REP.

Short, variable load profile: Average contract durations are 6 months to 36 months, which does not match the 24 or 36 month fixed-rate contracts suppliers typically push. Load varies by phase in ways that are hard to forecast from historical data (because the project is new).

Billing complexity: Contractors managing multiple job sites simultaneously can end up with dozens of temporary meter accounts, each with its own contract, bill, and renewal timing. Consolidation and billing visibility become a real problem for larger GCs.

Contract term alignment: Signing a 24-month contract on a 14-month build creates an ETF exposure at project completion. Signing month-to-month exposes the contractor to default rates that run meaningfully above market.

The right structure for construction accounts is a project-duration contract: term matched to the expected build timeline, with bandwidth that anticipates the phase ramp, and a clean exit at project completion. This is what Electric Decisions structures for construction clients.

What drives your monthly bill

Construction site electricity bills follow the same stack as any commercial account.

The energy charge is the per-kWh number suppliers quote.

TDSP delivery charges cover temporary service infrastructure. Regulated. Temporary service often carries higher delivery costs per kWh than permanent service.

Demand charges matter for peak-phase construction loads when commissioning draws large equipment simultaneously.

Regulatory, fees, and taxes close out the stack.

For a plain-English walk-through of how commercial electricity gets billed, see the commercial electricity pillar guide.

Contract decisions that move the number

Three decisions do most of the work on a construction site electricity contract.

Term length matched to project: The term should match the realistic build timeline plus a modest buffer, not the supplier's standard 24-month template. If the project is a 14-month build, the contract should be 14 to 18 months, not 24.

Bandwidth matched to phase ramp: Standard commercial bandwidth assumes relatively flat load with modest variance. Construction load ramps up and ramps down. Negotiate bandwidth that anticipates the phase pattern or ask for a construction-specific swing clause.

Clean exit at project completion: The contract should allow termination without ETF when the project is complete and the temporary meter closed. Most standard commercial contracts do not include this provision unless specifically negotiated.

The Texas early termination fees guide covers how ETFs trigger and how to negotiate them.

Multi-project builders and GCs have real leverage

General contractors, large residential builders, and construction management firms running multiple active projects simultaneously have a procurement advantage: aggregated load across temporary meters.

Suppliers price a combined contractor portfolio more aggressively because the volume is easier to hedge and one credit review covers all projects.

Coordination questions:

Master contract with project rollers: Larger GCs run a master contract that allows new projects to be added as they start, with each project rolled off as it completes.

TDU zone coverage: Builders operating statewide span multiple utility zones. The Texas Retail Electric Providers directory lists which suppliers actively bid each zone.

Billing consolidation: For a GC with 30 active projects, consolidated billing with per-project visibility is a real workflow improvement.

Permanent meter transition: For contractors who turn over the project to the owner, the master contract should include clean handoff provisions.

Where your project sits

Texas has four investor-owned TDUs plus municipal utilities. Oncor covers North Texas including the DFW construction corridor. CenterPoint covers Greater Houston. AEP Texas covers South and West Texas including fast-growing areas. TNMP covers non-contiguous zones. Austin Energy and CPS Energy are municipal utilities that do not allow retail choice. See all Texas cities for coverage.

Where contractors overpay

Signing a 24- or 36-month contract on a 14-month build. The project ends, the meter closes, the contract still has 10 to 22 months left on it. The ETF triggers. This is the single most common and most expensive construction procurement mistake.

Defaulting to month-to-month because the project duration is uncertain. Month-to-month temporary service often prices at variable rates that run meaningfully above a contracted rate.

Not consolidating multi-project billing. For a builder running 15 active projects, 15 separate contracts with 15 renewal dates and 15 bills is operationally expensive.

Ignoring the permanent meter transition. When the project completes and the permanent meter energizes, the contract and meter configuration both change. Without planning, this can trigger new contracts, ETFs, and billing disruption at the exact moment the project is closing out.

Comparing only cents per kWh. Temporary service delivery charges run higher per kWh than permanent commercial service, which affects the all-in math.

Timing the setup

For construction, the right time to engage on electricity is before the temporary meter is set, not after. Setting up the account on the supplier's default template often locks in a mismatch that is hard to unwind.

For single-project builders, start the conversation when the project schedule is confirmed. For multi-project GCs, run the procurement once at the GC level, then roll projects onto the master contract as they start.

How Electric Decisions runs a construction procurement

Five documented steps, adapted for the realities of construction accounts.

Step 1: Intake: We review your project schedule, expected phase ramps, and historical consumption for similar projects.

Step 2: Reference: We benchmark temporary service pricing against the live ERCOT forward curve for the project duration.

Step 3: Competition: We run an identical-specs RFP against suppliers who structure project-duration contracts, with term, bandwidth, and ETF treatment aligned to the actual build timeline.

Step 4: Contract: We red-line the paperwork in plain English. Term alignment, phase bandwidth, clean project-end exit, permanent meter transition language, and billing consolidation (for multi-project GCs).

Step 5: Execution: We manage the temporary meter installation coordination with the TDU and the REP, and the eventual transition to permanent service.

Our margin is disclosed in writing before you sign.

[02] FAQ

Construction energy questions, answered.

What buyers in this sector actually ask before a renewal.

[04] Benchmark

See what your construction account actually pays against the market

Share your project schedule and we will benchmark temporary service pricing against the live ERCOT forward curve for the project duration. No obligation, no supplier call until you ask.